Sign In | Join Free | My enlightcorp.com
China Xi'an Longjoy Foreign Trade Co.,Ltd logo
Xi'an Longjoy Foreign Trade Co.,Ltd
Xi'an Longjoy Foreign Trade Co., Ltd
Active Member

6 Years

Home > Ductile Iron Pipe Fittings >

High Pressure Main Pipeline Ductile Iron Tee

Xi'an Longjoy Foreign Trade Co.,Ltd
Contact Now

High Pressure Main Pipeline Ductile Iron Tee

  • 1
  • 2

Brand Name : Ductile iron tee

Model Number : LJ-PF053

Certification : ISO9001

Place of Origin : China

MOQ : 100pcs

Price : 1USD-100USD

Payment Terms : L/C, T/T

Supply Ability : Annual output 50000 tons

Delivery Time : Depends on the quantity of goods

Packaging Details : Export standard packaging

Product Name : Ductile iron tee

Use location: : Branch of main pipeline

Main function: : Change fluid direction

Texture of material: : Ductile iron

Color : black

Packing : Carton/wooden box

Contact Now

Description


Tees are pipe fittings and pipe connections. Also known as pipe tee or tee pipe fitting, tee joint, used in the main pipe branch. Tee is a kind of chemical pipe fitting with three orifices, i.e. one inlet and two outlets, or two inlets and one outlet, with T-shaped and Y-shaped, equal diameter pipe orifices and reducing pipe orifices.

The main function of tee is to change the direction of fluid.Tee can be divided into equal diameter tee and reducing tee according to pipe diameter. The nozzle end of equal tee is the same size; the main nozzle size of reducing tee is the same, and the nozzle size of branch pipe is smaller than that of main pipe.

The nodular cast iron tee is made of magnesium or rare earth magnesium combined with gold nodulizer before pouring, It makes the graphite spheroidized and the stress concentration reduced, improves the water delivery environment of the pipeline, improves the water supply capacity and reduces the energy consumption.

High Pressure Main Pipeline Ductile Iron Tee

Specification


Use location:Branch of main pipeline

Main function:Change fluid direction

Packing: Carton/wooden box

Characteristic


A circular valve piece is set on the valve. The valve piece is in a mutually sealed structure with the inner wall of the pipe cavity when the pipe cavity is closed.The innovation of nodular cast iron tee simplifies the pipeline setting, saves the consumption of pipeline parts, facilitates the operation, facilitates the maintenance of pipeline branch and the phased supply of each branch.

The utility model not only has the function of traditional three way pipe, but also plays the role of double position valve.One of the main pipe and branch pipe output can be selected as closed and the other as unblocked working state at will. The utility model can also adjust the flow ratio of the main pipe and branch pipe output at will, which can be realized only by adjusting the angle of the valve plate in the pipe cavity.

High Pressure Main Pipeline Ductile Iron Tee

Advantages


It is manufactured by EPC process with short production cycle and high dimensional accuracyCorrosion resistance, long service life.

The lining is cement mortar and Portland cement.It is coated with metallic zinc and asphalt paint.

According to ISO2531 standard, the pressure is PN16.Material: nodular iron, large volume, light weight, good ductility and toughness.

Technical data sheet


High Pressure Main Pipeline Ductile Iron Tee technical data sheet as below:

Specification Of Ductile iron Tee
Nominal Diameter OuteideDiamster Center to End
D1 D2
DN NPS Series A Series B Series A Series B C M
15x15x15 1/2x1/2x1/2 21.3 18 21.3 18 25 25
15x15x10 1/2x1/2x3/8 21.3 18 17.3 14 25 25
15x15x8 1/2x1/2x1/4 21.3 18 13.7 10 25 25
20x20x20 3/4x3/4x3/4 26.9 25 26.9 25 29 29
20x20x15 3/4x3/4x1/2 26.9 25 21.3 18 29 29
20x20x10 3/4x3/4x3/8 26.9 25 17.3 14 29 23
25x25x25 1x1x1 33.7 32 33.7 32 38 38
25x25x20 1x1x3/4 33.7 32 26.9 25 38 38
25x25x15 1x1x1/2 33.7 32 21.3 18 38 38
32x22x32 1.1/4x1.1/4x1.1/4 42.4 38 42.4 38 48 48
32x32x25 11/4x1.1/4x1 42.4 38 33.7 32 48 48
32x32x20 1.1/4x1.1/4x3/4 42.4 38 25.9 25 48 48
32x32x15 1.1/4x1.1/4x1/2 42.4 38 21.3 18 48 48

Package


a. Plastic bubble bag package b.Wove bag package c.Pallet d. Customized.

Delivery time


Our Steel flat factory have high ability for production, the delivery time is 45days for small quantity, or if you are hurry for that, we can arrange and meet your shipping date.


Product Tags:

Ductile Iron Tee

      

Pipeline di Tee

      
Quality High Pressure Main Pipeline Ductile Iron Tee for sale

High Pressure Main Pipeline Ductile Iron Tee Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Xi'an Longjoy Foreign Trade Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)